Charges for the use of the natural gas grid 2025 Price sheet
The grid fee to be paid consists of the components grid usage, metering and metering point operation.The prices include the biogas levy and the market area conversion levy. The prices are subject to the statutory value added tax and plus any other levies and, where applicable, the concession fee.
concession fee.
Use-of-system charge for points of service with interval metering (annual demand charge system)
Unit
From kWh
To kWh
Fee Ct/kWh
A zone 1
0
1.500.000
0,252
A zone 2
1.500.001
2.000.000
0,222
A zone 3
2.000.001
3.000.000
0,207
A zone 4
3.000.001
4.000.000
0,191
A zone 5
4.000.001
5.000.000
0,177
A zone 6
5.000.001
10.000.000
0,148
A zone 7
10.000.001
15.000.000
0,118
A zone 8
15.000.001
20.000.000
0,101
A zone 9
20.000.001
30.000.000
0,087
A zone 10
30.000.001
40.000.000
0,074
A zone 11
40.000.001
50.000.000
0,068
A zone 12
50.000.001
100.000.000
0,059
A zone 13
100.000.001
200.000.000
0,053
A zone 14
200.000.001
500.000.000
0,050
A zone 15
500.000.001
9.999.999.999
0,0478
Demand
From kW
To kW
Charge €/kW
P zone 1
0
800
15,491
P zone 2
801
1.000
14,112
P zone 3
1.001
1.500
13,432
P zone 4
1.501
1.900
12,685
P zone 5
1.901
2.200
12,165
P zone 6
2.201
4.100
10,964
P zone 7
4.101
5.800
9,608
P zone 8
5.801
7.400
8,820
P zone 9
7.401
10.400
8,085
P zone 10
10.401
13.400
7,484
P zone 11
13.401
16.200
7,120
P zone 12
16.201
29.300
6,643
P zone 13
29.301
53.100
6,184
P zone 14
53.101
116.400
5,960
P zone 15
116.401
999.999
5,849
Charges for meter operation and metering
Meter type
Meter operation €/a
Metering €/a
Category A.1
Turbine gas meter, Rotary displacement meter, Ultrasonic gas meter, Vortex flow meter, Diaphragm gas meter with ≥ DN250 nominal width with a gas volume conversion device
5.145,00
204,00
Category A.2
Turbine gas meter, Rotary displacement meter, Ultrasonic gas meter, Vortex flow meter, Diaphragm gas meter with ≥ DN250 nominal width with a gas volume conversion device or coriolis mass meter
2.850,00
204,00
Category B
Turbine gas meter, Rotary displacement meter, Ultrasonic gas meter, Vortex flow meter, Diaphragm gas meter with ≥ DN250 nominal width without a gas volume conversion device
Infraserv GmbH & Co. Höchst KG
Industriepark Höchst
65926 Frankfurt am Main
Charges for meter operation and metering
Meter type
Meter operation €/a
Metering €/a
Category A.1
Turbine gas meter, Rotary displacement meter, Ultrasonic gas meter, Vortex flow meter, Diaphragm gas meter with ≥ DN250 nominal width with a gas volume conversion device
5.145,00
204,00
Category A.2
Turbine gas meter, Rotary displacement meter, Ultrasonic gas meter, Vortex flow meter, Diaphragm gas meter with ≥ DN250 nominal width with a gas volume conversion device or coriolis mass meter
2.850,00
204,00
Category B
Turbine gas meter, Rotary displacement meter, Ultrasonic gas meter, Vortex flow meter, Diaphragm gas meter with ≥ DN250 nominal width without a gas volume conversion device
831,00
204,00
Provisional use-of-system charges for natural gas 2025
The provisional 2025 price sheet lists the expected use-of-system charges in 2025 based on the incomplete information available today. The charges are provisional within the meaning of Energy Industry Act (EnWG) § 20 (1) second sentence. That means they may still change due to factors such as changes in the upstream grid costs, the biogas levy, the market conversion surcharge and other surcharges. The charges listed in this publication are not final.
The final gas system charges for 2025 will be calculated as soon as all determinants have been finally determined and will be announced and/or published on this page by December 16, 2024.
The use-of-system charge covers the use of the system, metering and metering point operation. The prices include the value of the biogas levy and the market conversion surcharge. The prices may also be subject to additional surcharges, value-added tax and franchise fees.